Skip to content
Available today

Solar for your home, engineered for your roof.

Rooftop solar anywhere in Sarawak, under the Sarawak Energy NEM scheme. AeanesDaT designs the system and coordinates the application. A licensed partner installs it.

New 2025/2026 subsidy scheme announced

Get up to RM 12,000 cash rebate for your home solar system. Subject to eligibility and available quota.

Read guidelines

Estimate

Start with your bill.

An indicative system size, saving and subsidy band in a few seconds. No contact details needed.

RM

Sarawak solar profile

Sunlight reaching a flat surface each day, by month, at our Sarawak reference site.

Average 4.6 kWh/m² a day

3.03.54.04.55.05.5JanFebMarAprMayJunJulAugSepOctNovDec

Sunlight peaks in April (5.15 kWh/m²) and dips in January (3.50 kWh/m²) with the monsoon. Your system will generate more in some months than others; the estimate above uses the yearly figure.

Global horizontal irradiation · kWh/m² per day · Source: Global Solar Atlas

Subsidy

Sarawak Energy NEM subsidy

Sarawak Energy offers a one-off subsidy to eligible homeowners who install rooftop solar under NEM. The amount depends on the inverter capacity of the system.

  • For domestic tariff customers with landed residential properties.
  • The allocation is limited and applications are handled first come, first served.
  • Eligibility, amounts and timing are decided by Sarawak Energy and can change.
As announced for NEM agreements signed in 2025 and 2026
System capacitySubsidy
2.0 to 3.5 kWacRM 8,000
Above 3.5 to 6.0 kWacRM 10,000
Above 6.0 to 50 kWacRM 12,000

kWac is the inverter output, which is lower than the panel capacity in kWp.

How it works

From bill to switch-on, and who does what.

  1. 01

    Assess

    AeanesDaT

    Send us your recent bills, address and roof photos. We check the roof, your usage and likely eligibility.

  2. 02

    Design and proposal

    AeanesDaT

    We size the system, model its yield and give you a proposal with the layout, expected generation and cost.

  3. 03

    NEM application

    AeanesDaT coordinates · Sarawak Energy approves

    We prepare the technical drawings and documents and coordinate the application. Approval is decided by Sarawak Energy.

  4. 04

    Installation

    Licensed partner

    A licensed partner installs and commissions the system and holds the construction contract with you.

  5. 05

    Meter and switch-on

    Sarawak Energy

    Sarawak Energy inspects the installation and fits the meter that records what you import and export.

  6. 06

    After handover

    AeanesDaT and partner

    System monitoring and post-installation checks. We stay involved after the system is running.

Warranty and after-sales

Who stands behind each part.

ItemCoverProvided by
Solar panelsTypically around 25 years (performance)Panel manufacturer
InverterTypically around 10 yearsInverter manufacturer
WorkmanshipStated in your installation contractInstalling partner
Monitoring and checksAgreed in your proposalAeanesDaT

Typical figures. The exact terms for your equipment and installation are stated in your proposal.

Questions

What is Net Energy Metering (NEM) in Sarawak?

NEM lets eligible solar owners export surplus electricity to the Sarawak Energy grid and receive credits against their electricity bill. The exact crediting terms are set by Sarawak Energy, and we confirm the current terms with you before you commit.

Who can apply for the Sarawak Energy NEM subsidy?

The subsidy is aimed at eligible domestic tariff customers with landed residential properties, subject to current Sarawak Energy rules, quota availability and compliance requirements. It is not guaranteed.

How much can I save on my bill?

It depends on your roof size, system capacity, tariff and when you use electricity. Use the estimator on this page for an indicative figure, then send us your bills for an engineered estimate. We do not promise a fixed percentage.

Is the weather in Sarawak suitable for solar?

Yes. Our reference site receives an average of 4.6 kWh/m² a day (Global Solar Atlas). Sunlight varies a little by location, which your proposal accounts for. Output dips in the monsoon months and panels still generate on cloudy days. We design for the tropical climate and for the yearly pattern, not the best month.

What happens during a blackout?

A standard grid-tied solar system shuts down during a grid outage for safety. Backup power needs a hybrid system with battery storage. Battery storage is in development at AeanesDaT, and you should check the current subsidy rules on whether batteries can be included.

How long is the warranty?

Panels and inverters carry their manufacturers' warranties, typically around 25 years for panel performance and 10 years for inverters. The workmanship warranty is provided by the licensed partner who installs your system. Exact terms are stated in your proposal.

Does AeanesDaT handle the NEM application?

AeanesDaT prepares the engineering proposal and technical documents and coordinates the application to Sarawak Energy with our licensed partners. Approval and subsidy availability are decided by Sarawak Energy.

Which areas of Sarawak do you serve?

The whole of Sarawak, including Kuching, Sibu, Miri, Bintulu and the areas between them. Tell us where your site is and we will confirm the arrangements.

Request an assessment.

Tell us about your home. An engineer will reply with next steps and a proposal for your roof.

What helps us prepare a proposal

  • Latest 3 to 12 months of electricity bills
  • Address and photos of the roof
  • Location of the meter and distribution board
  • Homeowner details for the NEM application