Skip to content
Available today

Commercial solar, designed from your load profile.

Solar EPC for factories, offices, warehouses and commercial buildings across Sarawak. We start with a load study, not a package price.

Request a load study

What we study

Four things decide a commercial system.

Unlike a home, a business cannot be sized from its bill alone. We design from your maximum demand, roof limits and connection requirements.

  • Load profile and maximum demand

    Twelve months of bills show when you use energy and your maximum demand. The system is sized to your daytime load, not a rule of thumb.

  • Roof and structure

    Usable area, orientation, shading and structural limits decide how much capacity the roof can carry.

  • Grid compliance

    We check transformer capacity and the limits on how much solar can connect in your area.

  • Financial model

    Expected generation, operating savings, payback and return, set out with the assumptions behind them.

Routes

Export, self-consume, or both compared.

  • Net Energy Metering (NEM)

    Surplus energy is exported to the grid and credited against your bill under Sarawak Energy terms. Suits sites with spare roof and lower weekend load.

  • Self-consumption without export

    All generation is used on site, often called SELCO. Suits factories and facilities that run through the day and can use everything the system produces.

  • Green Investment Tax Allowance (GITA)

    A federal tax incentive that may apply to qualifying solar investment. Confirm current eligibility and terms with your tax adviser.

How it works

From load study to operation, and who does what.

  1. 01

    Load study

    AeanesDaT

    We review your bills, maximum demand and single line diagram, and visit the site where needed.

  2. 02

    Design and model

    AeanesDaT with partners

    System design, yield simulation and a financial model, with BIM-enabled design and M&E input from our partners.

  3. 03

    Proposal

    AeanesDaT

    A technical and commercial proposal comparing export and self-consumption routes for your site.

  4. 04

    Approvals

    AeanesDaT coordinates · authorities approve

    We prepare and coordinate submissions to Sarawak Energy and the relevant authorities.

  5. 05

    Construction

    Licensed EPC partner

    A licensed EPC partner builds, tests and commissions the system under a direct construction contract.

  6. 06

    Operation

    AeanesDaT and partner

    Monitoring and post-installation checks so performance can be tracked against the model.

Questions

Is NEM or SELCO better for a Sarawak business?

It depends on daytime consumption, maximum demand, roof capacity and export suitability. AeanesDaT compares both routes during proposal preparation.

What documents are needed for commercial solar?

The best starting point is 12 months of electricity bills, a site address, roof information and any available electrical single line diagram.

How long does a commercial solar project take?

It depends on system size, the approvals required and site conditions. We give a programme with your proposal once the load study is complete.

Can you promise a payback period?

No. We give a modelled payback range with its assumptions, based on your actual load and tariff. It is an estimate, not a guarantee.

Request a load study.

Tell us about your site. An engineer will reply to arrange the load study and explain what it covers.

What helps us prepare a proposal

  • Full electricity bills for the last 12 months
  • Single line diagram of your electrical system
  • Roof architectural drawings, if available
  • Site address and operating hours