Sarawak Energy NEM subsidy

Sarawak NEM subsidy guide for rooftop solar.

How the Sarawak Energy subsidy for home solar works: the amounts, who qualifies, and the steps from installation to payment.

Subsidy amounts

A flat amount, by system size.

The subsidy is a one-off payment for eligible homeowners who install rooftop solar under Net Energy Metering. The amount depends on the inverter (AC) capacity of the system, up to RM 12,000.

  • Applies to: NEM contracts signed in 2025 and 2026.
  • Payment: from January 2026, including for contracts signed during 2025.
  • Allocation: limited, and handled first come, first served.
Subsidy by system capacity
System capacitySubsidy
2.0 to 3.5 kWacRM 8,000
Above 3.5 to 6.0 kWacRM 10,000
Above 6.0 to 50 kWacRM 12,000

Capacity is measured in kWac, the inverter output, not the panel capacity in kWp.

Who qualifies

Eligibility criteria.

All of these must be met.

  • Property type

    A landed residential property: terrace, semi-detached or bungalow. Apartments and condominiums are excluded.

  • Tariff category

    The electricity account must be under the Domestic Tariff.

  • Account holder

    The registered SESCO account owner applies, and the bank account for payment must be in the same name.

  • Installer

    The system must be installed by a service provider with Solar PV Designer certification from the Electrical Inspectorate Unit (EIU).

  • One claim

    Each account owner can claim the subsidy once.

  • New systems only

    Properties that already have solar PV installed are not eligible.

  • No battery storage

    Battery energy storage systems are not allowed under this subsidy scheme.

How to apply

From installation to payment, and who does what.

  1. 01

    Installation and NEM contract

    AeanesDaT with licensed partner · you sign with Sarawak Energy

    We design the system and a certified, EIU-registered partner installs and commissions it. You sign the NEM contract with Sarawak Energy.

  2. 02

    Receive the application form

    Sarawak Energy

    Once eligibility is verified after installation, you receive the subsidy application form.

  3. 03

    Meter installation

    Sarawak Energy (SESCO)

    SESCO installs a PV meter. The connection charge is paid by the customer: RM 500 for a single-phase smart meter, RM 1,000 for three-phase.

  4. 04

    Submit the form within 7 days

    You, with our help

    Return the completed form within 7 days of receiving it. Late submissions may be rejected.

  5. 05

    Payment

    Sarawak Energy

    The subsidy is transferred to your bank account within 14 calendar days of the form submission or the PV meter installation, whichever is later.

Check before you commit. This guide reflects the scheme as announced for 2025 and 2026. Amounts, charges, deadlines and eligibility are set by Sarawak Energy and can change, and the subsidy is not guaranteed. Confirm current terms with Sarawak Energy.

How we help

What AeanesDaT does for you.

  • Eligibility review for domestic tariff, landed residential and account conditions.
  • System sizing support for the relevant NEM subsidy capacity bands.
  • Technical proposal preparation before submission and installation steps.
  • Clear guidance on documents such as bills, address details, roof photos and owner information.

Questions

Is the Sarawak NEM subsidy guaranteed?

No. Subsidy availability depends on current Sarawak Energy rules, quota and successful compliance with the scheme requirements.

Can AeanesDaT help me check eligibility?

Yes. AeanesDaT can review your electricity bill, property type and expected system size before preparing the next steps.

Check your eligibility.

Send us your bill and property details. We will review your eligibility and likely system size before you commit to anything.

What helps us prepare a proposal

  • Latest electricity bill showing the tariff and account name
  • Property type and address
  • Photos of the roof
  • Whether any solar is already installed